
Lassay-les-Châteaux, Mayenne, France
Stable
This racing stable for trotting horses replaces cramped, worn out buildings at the entrance to a shared training site. Two partners ran their horses there, and the brief was to give one of them a new stable so that the historic buildings used by the other could be renovated and kept. The training track and hay barn stay in common use.
The new building sits at the north-eastern edge of the property, on an open agricultural plateau exposed to strong winds. To shelter horses and staff it is set into a cut in the ground, and the excavated earth is reused to shape a future training straight to the east. The roof draws a horizontal line that follows the topography, so the building extends the landscape instead of interrupting it.
Walls seem to disappear into the site. Between the base and the pale roof only a translucent gap remains, keeping the surrounding fields in view and letting the roof merge with the sky as a new horizon for horses and trainers alike.
The plan is organised as a cross. A north to south spine holds the preparation areas for care, washing and warm-up, leading horses out to the track in the south and back to the walker in the north after a session. To the west sit staff rooms, parking, the farrier workshop, feed store, sulky storage and tack room. To the east, a calmer side is given over to a row of individual stalls, so active and quiet uses never collide.
Construction is simple and rational. A cast in place concrete base withstands daily contact with the animals, while the frame and cladding above are in local Douglas fir, left untreated to silver with time. A continuous polycarbonate band between base and roof floods the interior with daylight, and a polycarbonate ridge light above the timber portal frames and steel deck roof provides both overhead light and natural ventilation.
Built on a tight budget, the project embraces an economy of means: a restrained, durable agricultural building rooted in its landscape.
Project Information
- Design studio
- Carmen Maurice Architecture
- Area
- 1000 m²
- Time
- 2026
- Type
- Industrial
- Primary materials
- Concrete, Natural timber, Polycarbonate, Steel
























Comments